EV charging site
ICUEVE900244
Strand Road, Preston, PR1 8PQ
ICUEVE900244 is an EV charging site at Strand Road in Preston, Lancashire. It has a single 7 kW Type 2 socket. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Chorley Nissan Preston (Nissan UK Dealer Network), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at ICUEVE900244?
Up to 7 kW AC via Type 2.
How many charging sockets does ICUEVE900244 have?
1 charging socket: 1 × 7 kW Type 2.
Where is the nearest charger with 50 kW or more to ICUEVE900244?
Chorley Nissan Preston (Nissan UK Dealer Network) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at ICUEVE900244?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ICUEVE900244?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ICUEVE900244?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Chorley Nissan Preston
- Edward VII, 3A Navigation Way
- Fishergate Centre Car Park
- Winckley Square Preston
- Lawson Street Preston
- Pod Point Tesco Superstore - Penwortham
- Cheapest nearby
- Pod Point Tesco Superstore - Penwortham · 44.4p per kWh · 50 kW · 0.8 mi
- Fastest nearby
- Edward VII, 3A Navigation Way · 150 kW · 0.5 mi