Edward VII, 3A Navigation Way is an EV charging site in Preston, Lancashire, run by POGO. Its 8 sockets reach up to 150 kW, with CCS at the top speed, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 8 am, and Amp Map measured 100% uptime and recorded 190 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Chorley Nissan Preston (Nissan UK Dealer Network), 0.7 miles away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW6 connectors · 65p per kWh6 free
PoGo20189100% reliabilityAvailable
PoGo20189100% reliabilityAvailable
PoGo20190100% reliabilityAvailable
PoGo20190100% reliabilityAvailable
PoGo20191100% reliabilityAvailable
PoGo20191100% reliabilityAvailable
CCS · 25 kW2 connectors · 65p per kWh2 free
PoGo20192100% reliabilityAvailable
PoGo20193100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
PoGo20189

Always check directly with the charge point operator for the most up-to-date information.

Prices

65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Edward VII, 3A Navigation Way (POGO)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Edward VII, 3A Navigation Way (POGO)?

Up to 150 kW DC via CCS.

How many charging sockets does Edward VII, 3A Navigation Way (POGO) have?

8 charging sockets: 6 × 150 kW CCS, 2 × 25 kW CCS. Live per-socket availability is shown on this page.

When is Edward VII, 3A Navigation Way (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Edward VII, 3A Navigation Way (POGO)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 190 observed charging sessions.

Who operates Edward VII, 3A Navigation Way?

Edward VII, 3A Navigation Way is on the POGO network.

Where is the nearest other charger with 50 kW or more to Edward VII, 3A Navigation Way (POGO)?

Chorley Nissan Preston (Nissan UK Dealer Network) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Edward VII, 3A Navigation Way (POGO)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Edward VII, 3A Navigation Way (POGO)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Edward VII, 3A Navigation Way (POGO)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 21 Nov 2026