Lidl · EV charging site
Lidl-Gateshead Wrekenton
Durham Road, Felling, NE9 7JS
Lidl-Gateshead Wrekenton is an EV charging site in Felling, Gateshead, run by Lidl. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Angel of the North (Fastned), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Lidl
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.74/kWh; other tariffs available(from Open Charge Map, 26 Nov 2024)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lidl-Gateshead Wrekenton?
The listed price is £0.74/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lidl-Gateshead Wrekenton?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Lidl-Gateshead Wrekenton have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Lidl-Gateshead Wrekenton?
Lidl-Gateshead Wrekenton is on the Lidl network.
Where is the nearest other charger with 50 kW or more to Lidl-Gateshead Wrekenton?
Angel of the North (Fastned) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidl-Gateshead Wrekenton?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl-Gateshead Wrekenton?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidl-Gateshead Wrekenton?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Queen Elizabeth Hospital, Gateshead
- Angel of the North
- Crosskeys Lane
- Saltwell Park
- Gateshead College Autoskills Centre
- Heworth Leisure Centre
- Cheapest nearby
- Angel of the North · 79p per kWh · 50 kW · 1 mi