LiFe (Raw Charging) · EV charging site
Q Park Dale Street
Vernon Street, Liverpool, L2 2HJ
Q Park Dale Street is an EV charging site in Liverpool, run by LiFe (Raw Charging). Both of its sockets are 22 kW Type 2, and the price is listed as Usage and Parking fees apply. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Liverpool - Brunswick (Fastned), 1.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- LiFe (Raw Charging)
- Opening hours
- Not published
- Access
- Public
- Price
- Usage and Parking fees apply(from Open Charge Map, 2 Oct 2022)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Q Park Dale Street (LiFe (Raw Charging))?
The listed price is Usage and Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at Q Park Dale Street (LiFe (Raw Charging))?
Up to 22 kW AC via Type 2.
How many charging sockets does Q Park Dale Street (LiFe (Raw Charging)) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Q Park Dale Street?
Q Park Dale Street is on the LiFe (Raw Charging) network.
Where is the nearest charger with 50 kW or more to Q Park Dale Street (LiFe (Raw Charging))?
Liverpool - Brunswick (Fastned) is 1.8 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Q Park Dale Street (LiFe (Raw Charging))?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Q Park Dale Street (LiFe (Raw Charging))?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Q Park Dale Street (LiFe (Raw Charging))?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Vauxhall, Marybone
- Q-Park Liverpool ONE
- Q-Park Hanover Street
- Princes Dock (Liverpool)
- Princess Dock MSCP
- Q Park Liverpool John Lewis 4
- Cheapest nearby
- Princes Dock (Liverpool) · 65p per kWh · 22 kW · 0.4 mi