LiFe (Raw Charging) · EV charging site
Q-Park Liverpool ONE
Strand Street, Liverpool, L1 8LT
Q-Park Liverpool ONE is an EV charging site in Liverpool, run by LiFe (Raw Charging). Both of its sockets are 7 kW Type 2, and the price is listed as Usage and Parking fees apply. 14 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Liverpool - Brunswick (Fastned), 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- LiFe (Raw Charging)
- Opening hours
- Not published
- Access
- Public
- Price
- Usage and Parking fees apply(from Open Charge Map, 2 Oct 2022)
- Getting there
- On level 2 of car park, near John Lewis exit.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Q-Park Liverpool ONE (LiFe (Raw Charging))?
The listed price is Usage and Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at Q-Park Liverpool ONE (LiFe (Raw Charging))?
Up to 7 kW AC via Type 2.
How many charging sockets does Q-Park Liverpool ONE (LiFe (Raw Charging)) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Q-Park Liverpool ONE?
Q-Park Liverpool ONE is on the LiFe (Raw Charging) network.
Where is the nearest charger with 50 kW or more to Q-Park Liverpool ONE (LiFe (Raw Charging))?
Liverpool - Brunswick (Fastned) is 1.5 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Q-Park Liverpool ONE (LiFe (Raw Charging))?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Q-Park Liverpool ONE (LiFe (Raw Charging))?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Q-Park Liverpool ONE (LiFe (Raw Charging))?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Q Park Liverpool John Lewis 4
- Q-Park Hanover Street
- Q Park Dale Street
- ubitricity Distributed Energy Systems UK Ltd. 10 - 14 Jamaica Street
- Princes Dock (Liverpool)
- Princess Dock MSCP
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 10 - 14 Jamaica Street · 56p per kWh · 5 kW · 0.5 mi
- Fastest nearby
- Q-Park Hanover Street · 22 kW · 0.3 mi