LiFe (Raw Charging) · EV charging site
Q-Park Hanover Street
44 Hanover Street, Liverpool, L1 4AF
Q-Park Hanover Street is an EV charging site in Liverpool, run by LiFe (Raw Charging). All 4 of its sockets are 22 kW Type 2. 17 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Liverpool - Brunswick (Fastned), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- LiFe (Raw Charging)
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.30/kWh. Parking fees apply(from Open Charge Map, 2 Oct 2022)
- Getting there
- on level 2
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Q-Park Hanover Street (LiFe (Raw Charging))?
The listed price is £0.30/kWh. Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at Q-Park Hanover Street (LiFe (Raw Charging))?
Up to 22 kW AC via Type 2.
How many charging sockets does Q-Park Hanover Street (LiFe (Raw Charging)) have?
4 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Q-Park Hanover Street?
Q-Park Hanover Street is on the LiFe (Raw Charging) network.
Where is the nearest charger with 50 kW or more to Q-Park Hanover Street (LiFe (Raw Charging))?
Liverpool - Brunswick (Fastned) is 1.4 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Q-Park Hanover Street (LiFe (Raw Charging))?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Q-Park Hanover Street (LiFe (Raw Charging))?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Q-Park Hanover Street (LiFe (Raw Charging))?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Q Park Liverpool John Lewis 4
- Q-Park Liverpool ONE
- Mount Pleasant Car Park
- Q Park Dale Street
- ubitricity Distributed Energy Systems UK Ltd. 10 - 14 Jamaica Street
- ubitricity Distributed Energy Systems UK Ltd. 7 Bridgewater Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 10 - 14 Jamaica Street · 56p per kWh · 5 kW · 0.4 mi