Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Falmouth Exeter Plus

Penryn Campus Penryn, Falmouth, TR10 9FE

Pod Point Falmouth Exeter Plus is an EV charging site in Falmouth, Cornwall, run by Pod Point. All 12 of its sockets are 7 kW Type 2, and the published price is £0.28 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 359 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is McDonald's Falmouth (InstaVolt Ltd), 1.7 miles away.

Status

11 of 12 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW12 connectors · 27.6p per kWh11 free1 status unknown
Enid-Gina100% reliabilityAvailable
Enid-Gina100% reliabilityStatus unknown
Enzo-Elle100% reliabilityAvailable
Enzo-Elle100% reliabilityAvailable
Joey-Khan100% reliabilityAvailable
Joey-Khan100% reliabilityAvailable
Noel-Rhys100% reliabilityAvailable
Noel-Rhys100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Enid-Gina

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW27.6p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£15
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£11
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£14
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£14
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£12
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£11
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£7.73

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Falmouth Exeter Plus?

The listed price is £0.28/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Falmouth Exeter Plus?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Falmouth Exeter Plus have?

12 charging sockets: 12 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Falmouth Exeter Plus busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Pod Point Falmouth Exeter Plus?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 359 observed charging sessions.

Who operates Pod Point Falmouth Exeter Plus?

Pod Point Falmouth Exeter Plus is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Falmouth Exeter Plus?

McDonald's Falmouth (InstaVolt Ltd) is 1.7 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Falmouth Exeter Plus?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£15 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Falmouth Exeter Plus?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£11 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Falmouth Exeter Plus?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.