GeniePoint · EV charging site
Bridge Road, Leigh Woods
Leigh Woods, Bristol, BS83PA
Bridge Road, Leigh Woods is an EV charging site in Bristol, City of Bristol, run by GeniePoint. Both of its sockets are 22 kW Type 2. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Southville Services A370 (InstaVolt Ltd), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Bridge Road, Leigh Woods (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Bridge Road, Leigh Woods (GeniePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Bridge Road, Leigh Woods?
Bridge Road, Leigh Woods is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Bridge Road, Leigh Woods (GeniePoint)?
Southville Services A370 (InstaVolt Ltd) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bridge Road, Leigh Woods (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bridge Road, Leigh Woods (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bridge Road, Leigh Woods (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bristol City Council Building Car Park
- Pod Point Clifton College Sports Ground
- Southville Services A370
- West End Car Park
- The Ashton Bristol
- West End Car Park
- Cheapest nearby
- Pod Point Clifton College Sports Ground · 60p per kWh · 7 kW · 0.8 mi
- Fastest nearby
- Southville Services A370 · 50 kW · 0.9 mi