Total Energies · EV charging site
1 Hackney/Worship Street Site
111 Worship Street, Bethnal Green, EC2A 2BA
1 Hackney/Worship Street Site is an EV charging site in Bethnal Green, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 22 kW. 311 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hackney Council Calvert Avenue (GeniePoint), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 7 Oct 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 1 Hackney/Worship Street Site (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at 1 Hackney/Worship Street Site (Total Energies)?
Up to 22 kW AC via Type 2, J-1772.
How many charging sockets does 1 Hackney/Worship Street Site (Total Energies) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 4 kW J-1772.
Who operates 1 Hackney/Worship Street Site?
1 Hackney/Worship Street Site is on the Total Energies network.
Where is the nearest charger with 50 kW or more to 1 Hackney/Worship Street Site (Total Energies)?
Hackney Council Calvert Avenue (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 1 Hackney/Worship Street Site (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 1 Hackney/Worship Street Site (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 1 Hackney/Worship Street Site (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Worship Street
- ubitricity Distributed Energy Systems UK Ltd. 3 Folgate Street, Folgate Street
- ubitricity Distributed Energy Systems UK Ltd. 19 Folgate Street, Folgate Street
- ubitricity Distributed Energy Systems UK Ltd. 1 Fleur De Lis Street
- King John Court
- ubitricity Distributed Energy Systems UK Ltd. 11 Elder Street, Elder Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 3 Folgate Street, Folgate Street · 39p per kWh · 5 kW · 0.1 mi