Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Total Energies · EV charging site

King John Court

New Inn Yard, Bethnal Green, EC2A 3EX

King John Court is an EV charging site in Bethnal Green, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 343 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hackney Council Calvert Avenue (GeniePoint), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 24 Apr 2018Last verified 24 Apr 2018

Connectors

Type 2 · 7 kW2 connectors
J-1772 · 4 kW2 connectors

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Price
£0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 24 Apr 2018)
Getting there
on street charging bays. max stay 4 hours

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at King John Court (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

How fast is charging at King John Court (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

How many charging sockets does King John Court (Total Energies) have?

2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.

Who operates King John Court?

King John Court is on the Total Energies network.

Where is the nearest charger with 50 kW or more to King John Court (Total Energies)?

Hackney Council Calvert Avenue (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at King John Court (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at King John Court (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at King John Court (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 24 Apr 2018

Amp Map does not take payment. You pay the operator.