Total Energies · EV charging site
King John Court
New Inn Yard, Bethnal Green, EC2A 3EX
King John Court is an EV charging site in Bethnal Green, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 343 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hackney Council Calvert Avenue (GeniePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 24 Apr 2018)
- Getting there
- on street charging bays. max stay 4 hours
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at King John Court (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at King John Court (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does King John Court (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates King John Court?
King John Court is on the Total Energies network.
Where is the nearest charger with 50 kW or more to King John Court (Total Energies)?
Hackney Council Calvert Avenue (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at King John Court (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at King John Court (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at King John Court (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 28 Old Nichol Street, Opp.
- ubitricity Distributed Energy Systems UK Ltd. Navarre Street, Abingdon House
- ubitricity Distributed Energy Systems UK Ltd. Ligonier Street near junction Navarre Street
- 1 Hackney/Worship Street Site
- Worship Street
- Hackney Council Calvert Avenue
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 28 Old Nichol Street, Opp. · 55p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- Hackney Council Calvert Avenue · 50 kW · 0.2 mi