Total Energies · EV charging site
Worship Street
(Opposite) 105 Worship Street, Bethnal Green, EC2A 2DG
Worship Street is an EV charging site in Bethnal Green, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 300 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hackney Council Calvert Avenue (GeniePoint), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 27 Apr 2017)
- Notes
- New style tethered J1772 cable plus a Type 2 / Mennekes Socket.
- Getting there
- Only accessible from West or North
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Worship Street (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Worship Street (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Worship Street (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Worship Street?
Worship Street is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Worship Street (Total Energies)?
Hackney Council Calvert Avenue (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Worship Street (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Worship Street (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Worship Street (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 1 Hackney/Worship Street Site
- ubitricity Distributed Energy Systems UK Ltd. 3 Folgate Street, Folgate Street
- ubitricity Distributed Energy Systems UK Ltd. 19 Folgate Street, Folgate Street
- King John Court
- ubitricity Distributed Energy Systems UK Ltd. 1 Fleur De Lis Street
- ubitricity Distributed Energy Systems UK Ltd. 11 Elder Street, Elder Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 3 Folgate Street, Folgate Street · 55p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- 1 Hackney/Worship Street Site · 22 kW · 40 yd