Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Tingley Interchange

Dewsbury Rd. Tingley, Morley, WF3 1LD

Tingley Interchange is an EV charging site in Morley, City and Borough of Leeds, run by BP Pulse and open 24 hours a day. Its 30 sockets reach up to 300 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 97% uptime and recorded 1330 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is McDonald's Morley (InstaVolt Ltd), 1.1 miles away.

Status

28 of 30 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW20 connectors · 89p per kWh18 free1 in use1 out of service
BPA023498% reliabilityAvailable
BPA023498% reliabilityAvailable
BPA023896% reliabilityAvailable
BPA023896% reliabilityAvailable
BPA023998% reliabilityAvailable
BPA023998% reliabilityCharging
BPA024197% reliabilityAvailable
BPA024197% reliabilityAvailable
CHAdeMO · 100 kW10 connectors · 89p per kWh10 free
BPA023498% reliabilityAvailable
BPA023896% reliabilityAvailable
BPA023998% reliabilityAvailable
BPA024197% reliabilityAvailable
BPA024297% reliabilityAvailable
BPA024397% reliabilityAvailable
BPA024597% reliabilityAvailable
BPA025596% reliabilityAvailable
BPA025681% reliabilityAvailable
BPA026197% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPA0234

Always check directly with the charge point operator for the most up-to-date information.

Prices

89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Tingley Interchange (BP Pulse)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Tingley Interchange (BP Pulse)?

Up to 300 kW DC via CHAdeMO, CCS.

How many charging sockets does Tingley Interchange (BP Pulse) have?

30 charging sockets: 10 × 100 kW CHAdeMO, 20 × 300 kW CCS. Live per-socket availability is shown on this page.

Is Tingley Interchange (BP Pulse) open 24/7?

Yes - Tingley Interchange (BP Pulse) is open 24 hours a day, 7 days a week.

When is Tingley Interchange (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Tingley Interchange (BP Pulse)?

Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 1330 observed charging sessions.

Who operates Tingley Interchange?

Tingley Interchange is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Tingley Interchange (BP Pulse)?

McDonald's Morley (InstaVolt Ltd) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Tingley Interchange (BP Pulse)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tingley Interchange (BP Pulse)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Tingley Interchange (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.