EV charging site
Alfa Head Office
High Street, Morley, LS27 0BY
Alfa Head Office is an EV charging site in Morley, City and Borough of Leeds. Its 2 sockets reach up to 60 kW, with CCS and CHAdeMO at the top speed, and the price is listed as 30p/kWh. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Asda Morley (GeniePoint), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- 30p/kWh(from Open Charge Map, 24 Sept 2018)
- Notes
- Alfa Power charger.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Alfa Head Office?
The listed price is 30p/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Alfa Head Office?
Up to 60 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Alfa Head Office have?
2 charging sockets: 1 × 60 kW CCS, 1 × 60 kW CHAdeMO, 1 × 43 kW Type 2, 3 × 22 kW Type 2.
Where is the nearest other charger with 50 kW or more to Alfa Head Office?
Asda Morley (GeniePoint) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Alfa Head Office?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Alfa Head Office?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Alfa Head Office?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Manning Stainton - Leeds
- High Street Car Park 1
- Asda Morley
- Morrison's Morley
- Annie Street CP Morley
- Annie Street Car Park, Morley
- Cheapest nearby
- Pod Point Manning Stainton - Leeds · 28.8p per kWh · 7 kW · 0.3 mi