Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Alfa Head Office

High Street, Morley, LS27 0BY

Alfa Head Office is an EV charging site in Morley, City and Borough of Leeds. Its 2 sockets reach up to 60 kW, with CCS and CHAdeMO at the top speed, and the price is listed as 30p/kWh. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Asda Morley (GeniePoint), 0.4 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 24 Sept 2018Last verified 24 Sept 2018

Connectors

CCS · 60 kW1 connector
CHAdeMO · 60 kW1 connector
Type 2 · 43 kW1 connector
Type 2 · 22 kW3 connectors

Site information

Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Price
30p/kWh(from Open Charge Map, 24 Sept 2018)
Notes
Alfa Power charger.

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 60 kW CCS~58 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 60 kW CCS~43 min
Audi Q4 e-tron 50 10–80% · 60 kW CCS~57 min
Hyundai IONIQ 5 10–80% · 60 kW CCS~53 min
MG Motor MG4 Trophy 10–80% · 60 kW CCS~47 min
Hyundai Kona Electric Long Range 10–80% · 60 kW CCS~49 min
Nissan LEAF 10–80% · 60 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Alfa Head Office?

The listed price is 30p/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Alfa Head Office?

Up to 60 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Alfa Head Office have?

2 charging sockets: 1 × 60 kW CCS, 1 × 60 kW CHAdeMO, 1 × 43 kW Type 2, 3 × 22 kW Type 2.

Where is the nearest other charger with 50 kW or more to Alfa Head Office?

Asda Morley (GeniePoint) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Alfa Head Office?

A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Alfa Head Office?

A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Alfa Head Office?

A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 24 Sept 2018

Amp Map does not take payment. You pay the operator.