Pod Point · EV charging site
Pod Point Manning Stainton - Leeds
The Chapel, Bridge Street Morley, LS27 0EY
Pod Point Manning Stainton - Leeds is an EV charging site in Morley, City and Borough of Leeds, run by Pod Point. It has a single 7 kW Type 2 socket, and the published price is £0.29 per kWh. Amp Map measured 0% uptime here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Alfa Head Office, 0.3 miles away.
Status
Out of service
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Ryan-Kyla
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 28.8p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Manning Stainton - Leeds?
The listed price is £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Manning Stainton - Leeds?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Manning Stainton - Leeds have?
1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Pod Point Manning Stainton - Leeds?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Manning Stainton - Leeds?
Pod Point Manning Stainton - Leeds is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Manning Stainton - Leeds?
Alfa Head Office is 0.3 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Manning Stainton - Leeds?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Manning Stainton - Leeds?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£11 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Manning Stainton - Leeds?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£15 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Alfa Head Office
- High Street Car Park 1
- Asda Morley
- Annie Street CP Morley
- Morrison's Morley
- Annie Street Car Park, Morley
- Fastest nearby
- Alfa Head Office · 60 kW · 0.3 mi