GeniePoint · EV charging site
Annie Street Car Park, Morley
Annie Street, Morley, LS27 8HQ
Annie Street Car Park, Morley is an EV charging site in Morley, City and Borough of Leeds, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrison's Morley (GeniePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Annie Street Car Park, Morley (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Annie Street Car Park, Morley (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Annie Street Car Park, Morley?
Annie Street Car Park, Morley is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Annie Street Car Park, Morley (GeniePoint)?
Morrison's Morley (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Annie Street Car Park, Morley (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Annie Street Car Park, Morley (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Annie Street Car Park, Morley (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrison's Morley
- Annie Street CP Morley
- High Street Car Park 1
- Alfa Head Office
- Pod Point Manning Stainton - Leeds
- Shell, Victoria Filling Station
- Cheapest nearby
- Pod Point Manning Stainton - Leeds · 28.8p per kWh · 7 kW · 0.8 mi
- Fastest nearby
- Alfa Head Office · 60 kW · 0.6 mi