GeniePoint · EV charging site
Morrison's Morley
Morley, LS27 9JP
Morrison's Morley is an EV charging site in Morley, City and Borough of Leeds, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CCS at the top speed, and the price is listed as 35p per kW. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Annie Street Car Park, Morley (GeniePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- 35p per kW(from Open Charge Map, 28 May 2021)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrison's Morley (GeniePoint)?
The listed price is 35p per kW. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrison's Morley (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrison's Morley (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrison's Morley?
Morrison's Morley is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrison's Morley (GeniePoint)?
Annie Street Car Park, Morley (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrison's Morley (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrison's Morley (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrison's Morley (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Annie Street Car Park, Morley
- Annie Street CP Morley
- High Street Car Park 1
- Alfa Head Office
- Shell, Victoria Filling Station
- Pod Point Manning Stainton - Leeds
- Cheapest nearby
- Pod Point Manning Stainton - Leeds · 28.8p per kWh · 7 kW · 0.7 mi
- Fastest nearby
- Alfa Head Office · 60 kW · 0.5 mi