GeniePoint · EV charging site
Asda Morley
Morley, LS270BP
Asda Morley is an EV charging site in Morley, City and Borough of Leeds, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Alfa Head Office, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Asda Morley (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Asda Morley (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Asda Morley?
Asda Morley is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Asda Morley (GeniePoint)?
Alfa Head Office is 0.4 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Asda Morley (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Asda Morley (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Asda Morley (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Alfa Head Office
- Pod Point Manning Stainton - Leeds
- Shell, Victoria Filling Station
- High Street Car Park 1
- Morrison's Morley
- Annie Street CP Morley
- Cheapest nearby
- Pod Point Manning Stainton - Leeds · 28.8p per kWh · 7 kW · 0.6 mi
- Fastest nearby
- Alfa Head Office · 60 kW · 0.4 mi