Connected Kerb · EV charging site
First Avenue 1, Poplar Street
First Avenue 1, Ashington, NE63 9DY
First Avenue 1, Poplar Street is an EV charging site in Ashington, Northumberland, run by Connected Kerb. Both of its sockets are 22 kW Type 2. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Dairy House Car Park (Fuuse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at First Avenue 1, Poplar Street (Connected Kerb)?
Up to 22 kW AC via Type 2.
How many charging sockets does First Avenue 1, Poplar Street (Connected Kerb) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates First Avenue 1, Poplar Street?
First Avenue 1, Poplar Street is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to First Avenue 1, Poplar Street (Connected Kerb)?
Dairy House Car Park (Fuuse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at First Avenue 1, Poplar Street (Connected Kerb)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at First Avenue 1, Poplar Street (Connected Kerb)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at First Avenue 1, Poplar Street (Connected Kerb)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ashington Railway Station Car Park
- Dairy House Car Park
- Lintonville Parkway
- Sixth Av
- Ashington
- Wansbeck General Hospital
- Fastest nearby
- Dairy House Car Park · 50 kW · 0.3 mi