Fuuse · EV charging site
Dairy House Car Park
Kenilworth Road, Ashington, NE63 0SF
Dairy House Car Park is an EV charging site in Ashington, Northumberland, run by Fuuse. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.65/kWh. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Wansbeck General Hospital (Charge Your Car), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Price
- £0.65/kWh(from Open Charge Map, 17 Dec 2024)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Getting there
- On left hand side as you enter car park. Operated by Northumberland County Council.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Dairy House Car Park (Fuuse)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Dairy House Car Park (Fuuse)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Dairy House Car Park (Fuuse) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Dairy House Car Park?
Dairy House Car Park is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to Dairy House Car Park (Fuuse)?
Wansbeck General Hospital (Charge Your Car) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dairy House Car Park (Fuuse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dairy House Car Park (Fuuse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dairy House Car Park (Fuuse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.