EO Charging · EV charging site
Sixth Av
Sixth Avenue, Ashington, NE63 0PQ
Sixth Av is an EV charging site in Ashington, Northumberland, run by EO Charging. It has a single 22 kW Type 2 socket. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Dairy House Car Park (Fuuse), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EO Charging
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 333 772 0383
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Sixth Av (EO Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Sixth Av (EO Charging) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Sixth Av?
Sixth Av is on the EO Charging network. For site issues, the operator lists +44 333 772 0383.
Where is the nearest charger with 50 kW or more to Sixth Av (EO Charging)?
Dairy House Car Park (Fuuse) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sixth Av (EO Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sixth Av (EO Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sixth Av (EO Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Newbiggin Road
- First Avenue 1, Poplar Street
- Ashington Railway Station Car Park
- Dairy House Car Park
- Co-op Newbiggin Road, Ashington
- Lintonville Parkway
- Cheapest nearby
- Co-op Newbiggin Road, Ashington · 89p per kWh · 300 kW · 0.7 mi
- Fastest nearby
- Co-op Newbiggin Road, Ashington · 300 kW · 0.7 mi