evcharge.online · EV charging site
Ashington Railway Station Car Park
Kenilworth Road, Ashington, NE63 8AS
Ashington Railway Station Car Park is an EV charging site in Ashington, Northumberland, run by evcharge.online. All 14 of its sockets are 7 kW Type 2, and the price is listed as £0.57/kWh. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Dairy House Car Park (Fuuse), 100 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public
- Price
- £0.57/kWh(from Open Charge Map, 17 Dec 2024)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Ashington Railway Station Car Park (evcharge.online)?
The listed price is £0.57/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Ashington Railway Station Car Park (evcharge.online)?
Up to 7 kW AC via Type 2.
How many charging sockets does Ashington Railway Station Car Park (evcharge.online) have?
14 charging sockets: 14 × 7 kW Type 2.
Who operates Ashington Railway Station Car Park?
Ashington Railway Station Car Park is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to Ashington Railway Station Car Park (evcharge.online)?
Dairy House Car Park (Fuuse) is 100 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ashington Railway Station Car Park (evcharge.online)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ashington Railway Station Car Park (evcharge.online)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ashington Railway Station Car Park (evcharge.online)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Dairy House Car Park · 50 kW · 100 yd