Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Eastgate Car Park

Eastgate, Pickering, YO18 7DP

Eastgate Car Park is an EV charging site in Pickering, North Yorkshire. It has a single 22 kW Type 2 socket. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is zest-hand-firm-farm (Zest Charging), 60 yards away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 28 Aug 2021Last verified 28 Aug 2021

Connectors

Type 2 · 22 kW4 connectors

Site information

Opening hours
Not published
Access
Public
Price
25/kWh. App or RFID.(from Open Charge Map, 28 Aug 2021)
Notes
4 Connected Kerb 22kW charging information can be found on the charger
Getting there
parking fees apply while charging : 9am - 18.30pm

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Eastgate Car Park?

The listed price is 25/kWh. App or RFID.. Prices can change, so check the price at the charger before you start.

How fast is charging at Eastgate Car Park?

Up to 22 kW AC via Type 2.

How many charging sockets does Eastgate Car Park have?

1 charging socket: 4 × 22 kW Type 2.

Where is the nearest charger with 50 kW or more to Eastgate Car Park?

zest-hand-firm-farm (Zest Charging) is 60 yards away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Eastgate Car Park?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Eastgate Car Park?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Eastgate Car Park?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 28 Aug 2021

Amp Map does not take payment. You pay the operator.