EV charging site
Eastgate Car Park
Eastgate, Pickering, YO18 7DP
Eastgate Car Park is an EV charging site in Pickering, North Yorkshire. It has a single 22 kW Type 2 socket. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is zest-hand-firm-farm (Zest Charging), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- 25/kWh. App or RFID.(from Open Charge Map, 28 Aug 2021)
- Notes
- 4 Connected Kerb 22kW charging information can be found on the charger
- Getting there
- parking fees apply while charging : 9am - 18.30pm
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Eastgate Car Park?
The listed price is 25/kWh. App or RFID.. Prices can change, so check the price at the charger before you start.
How fast is charging at Eastgate Car Park?
Up to 22 kW AC via Type 2.
How many charging sockets does Eastgate Car Park have?
1 charging socket: 4 × 22 kW Type 2.
Where is the nearest charger with 50 kW or more to Eastgate Car Park?
zest-hand-firm-farm (Zest Charging) is 60 yards away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Eastgate Car Park?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Eastgate Car Park?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Eastgate Car Park?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Flamingo Land · 80 kW · 2.9 mi