Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Flamingo Land · EV charging site

Flamingo Land

Flamingo Land Resort, Pickering, YO17

Flamingo Land is an EV charging site in Pickering, North Yorkshire, run by Flamingo Land and open 24 hours a day. Its 14 sockets reach up to 80 kW, with CCS at the top speed. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 131 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is zest-task-need-hall (Zest Charging), 2.9 miles away.

Status

13 of 14 available

Checking status…

VerifiedLive status and details from Flamingo Land’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 80 kW2 connectors2 free
ULTRA0453-A99% reliabilityAvailable
ULTRA0453-B99% reliabilityAvailable
Type 2 · 7 kW12 connectors11 free1 in use
DML47578-1100% reliabilityAvailable
DML47578-2100% reliabilityAvailable
DML47603-1100% reliabilityAvailable
DML47603-2100% reliabilityAvailable
DML47616-1100% reliabilityAvailable
DML47616-2100% reliabilityAvailable
DML47652-1100% reliabilityAvailable
DML47652-2100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the operator's appRFID card
Charger ID
DML47578-1

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 80 kW CCS~44 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 80 kW CCS~33 min
Audi Q4 e-tron 50 10–80% · 80 kW CCS~47 min
Hyundai IONIQ 5 10–80% · 80 kW CCS~40 min
MG Motor MG4 Trophy 10–80% · 80 kW CCS~38 min
Hyundai Kona Electric Long Range 10–80% · 80 kW CCS~42 min
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Flamingo Land?

Up to 80 kW DC via CCS, Type 2.

How many charging sockets does Flamingo Land have?

14 charging sockets: 2 × 80 kW CCS, 12 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Flamingo Land open 24/7?

Yes - Flamingo Land is open 24 hours a day, 7 days a week.

When is Flamingo Land busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Flamingo Land?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 131 observed charging sessions.

Who operates Flamingo Land?

Flamingo Land is on the Flamingo Land network.

Where is the nearest other charger with 50 kW or more to Flamingo Land?

zest-task-need-hall (Zest Charging) is 2.9 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Flamingo Land?

A typical 10–80% rapid charge takes about 44 min on the 80 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Flamingo Land?

A typical 10–80% rapid charge takes about 33 min on the 80 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Flamingo Land?

A typical 10–80% rapid charge takes about 47 min on the 80 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Flamingo Land · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.