Zest Charging · EV charging site
zest-task-need-hall
North Yorkshire Council, Ropery, Ryedale, Pickering, YO18 8DY
zest-task-need-hall is an EV charging site in Pickering, North Yorkshire, run by Zest Charging. It has a single 75 kW Type 2 socket. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is zest-hand-firm-farm (Zest Charging), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zest Charging
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 333 577 6760
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at zest-task-need-hall (Zest Charging)?
Up to 75 kW DC via Type 2.
How many charging sockets does zest-task-need-hall (Zest Charging) have?
1 charging socket: 1 × 75 kW Type 2.
Who operates zest-task-need-hall?
zest-task-need-hall is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.
Where is the nearest other charger with 50 kW or more to zest-task-need-hall (Zest Charging)?
zest-hand-firm-farm (Zest Charging) is 0.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at zest-task-need-hall (Zest Charging)?
A typical 10–80% rapid charge takes about 47 min on the 75 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at zest-task-need-hall (Zest Charging)?
A typical 10–80% rapid charge takes about 35 min on the 75 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at zest-task-need-hall (Zest Charging)?
A typical 10–80% rapid charge takes about 49 min on the 75 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Flamingo Land · 80 kW · 2.9 mi