Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Zest Charging · EV charging site

zest-task-need-hall

North Yorkshire Council, Ropery, Ryedale, Pickering, YO18 8DY

zest-task-need-hall is an EV charging site in Pickering, North Yorkshire, run by Zest Charging. It has a single 75 kW Type 2 socket. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is zest-hand-firm-farm (Zest Charging), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 7 Dec 2023Last verified 7 Dec 2023

Connectors

Type 2 · 75 kW1 connector

Site information

Opening hours
Not published
Access
Public
Phone (from Open Charge Map)
+44 333 577 6760

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW Type 2~47 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW Type 2~35 min
Audi Q4 e-tron 50 10–80% · 75 kW Type 2~49 min
Hyundai IONIQ 5 10–80% · 75 kW Type 2~43 min
MG Motor MG4 Trophy 10–80% · 75 kW Type 2~40 min
Hyundai Kona Electric Long Range 10–80% · 75 kW Type 2~43 min
Nissan LEAF 10–80% · 75 kW Type 2~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at zest-task-need-hall (Zest Charging)?

Up to 75 kW DC via Type 2.

How many charging sockets does zest-task-need-hall (Zest Charging) have?

1 charging socket: 1 × 75 kW Type 2.

Who operates zest-task-need-hall?

zest-task-need-hall is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.

Where is the nearest other charger with 50 kW or more to zest-task-need-hall (Zest Charging)?

zest-hand-firm-farm (Zest Charging) is 0.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at zest-task-need-hall (Zest Charging)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at zest-task-need-hall (Zest Charging)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at zest-task-need-hall (Zest Charging)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 7 Dec 2023

Amp Map does not take payment. You pay the operator.