EV charging site
Vivis Lane Car Park
Vivis Lane Car Park, Pickering, YO18 8BL
Vivis Lane Car Park is an EV charging site in Pickering, North Yorkshire. All 4 of its sockets are 22 kW Type 2, and the price is listed as 25p per kW. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is zest-task-need-hall (Zest Charging), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- 25p per kW(from Open Charge Map, 28 Aug 2021)
- Notes
- use App or RFID card : information on charger
- Getting there
- parking fees apply while charging 9am - 18.30pm
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Vivis Lane Car Park?
The listed price is 25p per kW. Prices can change, so check the price at the charger before you start.
How fast is charging at Vivis Lane Car Park?
Up to 22 kW AC via Type 2.
How many charging sockets does Vivis Lane Car Park have?
4 charging sockets: 4 × 22 kW Type 2.
Where is the nearest charger with 50 kW or more to Vivis Lane Car Park?
zest-task-need-hall (Zest Charging) is 0.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Vivis Lane Car Park?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Vivis Lane Car Park?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Vivis Lane Car Park?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Flamingo Land · 80 kW · 2.8 mi