Nene Park Trust · EV charging site
Nene Park Trust
Ferry Meadows in Nene Park, Peterborough, PE2 5UU
Nene Park Trust is an EV charging site in Peterborough, run by Nene Park Trust and open 24 hours a day. All 26 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 97 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Starbucks Ortongate (InstaVolt Ltd), 1.5 miles away.
Status
26 of 26 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Nene Park Trust
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- 1-A
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Nene Park Trust?
Up to 7 kW AC via Type 2.
How many charging sockets does Nene Park Trust have?
26 charging sockets: 26 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Nene Park Trust open 24/7?
Yes - Nene Park Trust is open 24 hours a day, 7 days a week.
When is Nene Park Trust busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Nene Park Trust?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 97 observed charging sessions.
Who operates Nene Park Trust?
Nene Park Trust is on the Nene Park Trust network.
Where is the nearest charger with 50 kW or more to Nene Park Trust?
Starbucks Ortongate (InstaVolt Ltd) is 1.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nene Park Trust?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nene Park Trust?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nene Park Trust?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Westpoint
- Starbucks Ortongate
- Ortongate Shopping Centre, Peterborough
- Ortongate Shopping Centre
- Best Western Plus, Orton Hall Hotel & Spa
- Pod Point Dragonfly Hotel - Peterborough
- Cheapest nearby
- Pod Point Dragonfly Hotel - Peterborough · 69.6p per kWh · 7 kW · 2 mi
- Fastest nearby
- Starbucks Ortongate · 50 kW · 1.5 mi